All demolition works shall require permit from the Assembly. Sufficient precaution shall be taken to safeguard public safety, health, adjoining properties and properties with heritage significance. Pollution in relation to air, water, noise and soils shall be avoided or properly mitigated. Application for Demolition Permit Persons seeking to apply for […]
Continue readingCategory Archives: Building Activities
Extension of Existing Building
The addition of a usable area or utility space to an existing structure shall constitute an extension. Applications for permit to extend existing structures which do not have prior permit shall be treated solely as applications for regularization of permit.
Continue readingRegularization of Existing Structures
Regularization of permit shall be undertaken for all structures that have been developed without permits. Only structures that meet minimum condition for the grant for regular development permit shall qualify for the grant of regularization permit All applications to regularize permits for existing structures shall be required to submit all […]
Continue readingTemporary Structure Permit
A temporary structure is any physical structure constructed, installed or placed on spaces zoned for permanent uses and meant to facilitate the construction of a permanent structure, serve short term emergency needs or facilitate small scale business operations. The temporary permit shall be renewable every six months for a period not exceeding […]
Continue readingCertificate of Completion for Habitation
A developer is required to apply for a completion certificate for habitation before occupying a building after completion as per Regulation 10-7 L. I. 1630, Act 925, Section 161.
Continue readingExtension of Time
A development/building permit issued is valid for 5years as per Instrument 7 of L.I.1630, 1996 (5 years). Consequently, a developer who is unable to complete development shall apply for planning permission for an extension of time.